Circulation in co-activity

Checking the aircraft parking position

Checking the cargo holds after unloading

Checking the height of the aircraft during loading and unloading

During the approach and withdrawal of equipment

Cabin baggage put in the hold, passenger questioning

Deploying an airbridge safely

Crossing a taxiway

Every alarm must be dealt with

Limiting risks related to FOD

Loading and securing bulk goods

Preparation of loading documents

Respect the loading height in the bulk hold

Respecting the loading plan

Securing pallets and containers in the hold

Safety on the aircraft stand during refuelling

Use a stepladder to open or close cargo doors

Systematic retracting of the airbridge before and after departure

Transmitting loading information

Systematic reporting of aircraft damage

Weight data no margin for error!

When an aircraft arrives, respect the unloading order

Systematic reporting of aircraft damage (ITA)
 
Checking the cargo holds after unloading-ITA
 
Limiting risks related to FOD-ITA
 

About Us

GH Italia
Airport Handling
IT Department
Viale Fulco Ruffo di Calabria (Pal.Pegaso) - 80144 Capodichino (NA)
+39 081 19494005
it@ghitalia.it

I nostri partner

© 2016 GH Italia All Rights Reserved.

Search